Foram encontradas 40 questões.
Provas
Provas
José, João e Maria irão viajar e cada um utilizará uma combinação entre ônibus, avião e navio como meios de transporte. Sabe-se que:
1. João utilizará dois dos meios de transporte citados.
2. Se Maria utilizar avião, então João não utilizará avião nem navio.
3. Se José utilizar avião ou navio, então Maria utilizará avião.
Portanto podemos afirmar corretamente que José utilizará:
Provas
Provas
Provas
The main issues of the Brazilian port system
Since the beginning of the privatization of the Brazilian ports in 1995, the lessee companies of container terminals have invested approximately USD 1 billion acquisition of modern equipment, physical infrastructure, training of manpower and infrastructure.
Particularly after the injection of resources by the Federal Government through the Growth Acceleration Program (PAC), the situation at the Brazilian ports started to improve.
Part of the dredging works in the main Brazilian ports are finished. With the sea deeper along the ports’ area, it is estimated that around 30% of the vessels worldwide that could not dock in Brazil before, now can.
But what used to be an issue at the sea, now it is an issue at the land. The logistical problems of access are evident, the bottleneck of access from the cargo container terminals generate unproductive periods, which are highly detrimental to the foreign trade and financial activity of Brazil. It is a fact that the rail network and roads in the vicinity of the ports are insufficient.
Another great matter about the Brazilian ports is the bureaucracy. Besides making everything more expensive, slowness in the Brazilian ports invented a truly “congestion at sea”. Every ship that arrives in the country waits at least 5.5 days to have the goods delivered by agencies such as IRS, the National Sanitary Surveillance Agency (ANVISA), the Ministry of Agriculture and the Docks. The world average is three days.
In Brazil, the organs responsible for clearance of goods
run only during business hours. It is the only country
among the world’s major economies, which does not
have these services available 24 hours.
Match the words in column 1 to their correct definition in column 2.
Column 1 Words
1. improve
2. lessee
3. vessels
4. issue
5. foreign
Column 2 Definition
( ) ship
( ) from another country
( ) holder of lease
( ) point in question
( ) become better
Choose the alternative that presents the correct sequence, from top to botton.
Provas
The main issues of the Brazilian port system
Since the beginning of the privatization of the Brazilian ports in 1995, the lessee companies of container terminals have invested approximately USD 1 billion acquisition of modern equipment, physical infrastructure, training of manpower and infrastructure.
Particularly after the injection of resources by the Federal Government through the Growth Acceleration Program (PAC), the situation at the Brazilian ports started to improve.
Part of the dredging works in the main Brazilian ports are finished. With the sea deeper along the ports’ area, it is estimated that around 30% of the vessels worldwide that could not dock in Brazil before, now can.
But what used to be an issue at the sea, now it is an issue at the land. The logistical problems of access are evident, the bottleneck of access from the cargo container terminals generate unproductive periods, which are highly detrimental to the foreign trade and financial activity of Brazil. It is a fact that the rail network and roads in the vicinity of the ports are insufficient.
Another great matter about the Brazilian ports is the bureaucracy. Besides making everything more expensive, slowness in the Brazilian ports invented a truly “congestion at sea”. Every ship that arrives in the country waits at least 5.5 days to have the goods delivered by agencies such as IRS, the National Sanitary Surveillance Agency (ANVISA), the Ministry of Agriculture and the Docks. The world average is three days.
In Brazil, the organs responsible for clearance of goods
run only during business hours. It is the only country
among the world’s major economies, which does not
have these services available 24 hours.
Provas
The main issues of the Brazilian port system
Since the beginning of the privatization of the Brazilian ports in 1995, the lessee companies of container terminals have invested approximately USD 1 billion acquisition of modern equipment, physical infrastructure, training of manpower and infrastructure.
Particularly after the injection of resources by the Federal Government through the Growth Acceleration Program (PAC), the situation at the Brazilian ports started to improve.
Part of the dredging works in the main Brazilian ports are finished. With the sea deeper along the ports’ area, it is estimated that around 30% of the vessels worldwide that could not dock in Brazil before, now can.
But what used to be an issue at the sea, now it is an issue at the land. The logistical problems of access are evident, the bottleneck of access from the cargo container terminals generate unproductive periods, which are highly detrimental to the foreign trade and financial activity of Brazil. It is a fact that the rail network and roads in the vicinity of the ports are insufficient.
Another great matter about the Brazilian ports is the bureaucracy. Besides making everything more expensive, slowness in the Brazilian ports invented a truly “congestion at sea”. Every ship that arrives in the country waits at least 5.5 days to have the goods delivered by agencies such as IRS, the National Sanitary Surveillance Agency (ANVISA), the Ministry of Agriculture and the Docks. The world average is three days.
In Brazil, the organs responsible for clearance of goods
run only during business hours. It is the only country
among the world’s major economies, which does not
have these services available 24 hours.
Provas
The main issues of the Brazilian port system
Since the beginning of the privatization of the Brazilian ports in 1995, the lessee companies of container terminals have invested approximately USD 1 billion acquisition of modern equipment, physical infrastructure, training of manpower and infrastructure.
Particularly after the injection of resources by the Federal Government through the Growth Acceleration Program (PAC), the situation at the Brazilian ports started to improve.
Part of the dredging works in the main Brazilian ports are finished. With the sea deeper along the ports’ area, it is estimated that around 30% of the vessels worldwide that could not dock in Brazil before, now can.
But what used to be an issue at the sea, now it is an issue at the land. The logistical problems of access are evident, the bottleneck of access from the cargo container terminals generate unproductive periods, which are highly detrimental to the foreign trade and financial activity of Brazil. It is a fact that the rail network and roads in the vicinity of the ports are insufficient.
Another great matter about the Brazilian ports is the bureaucracy. Besides making everything more expensive, slowness in the Brazilian ports invented a truly “congestion at sea”. Every ship that arrives in the country waits at least 5.5 days to have the goods delivered by agencies such as IRS, the National Sanitary Surveillance Agency (ANVISA), the Ministry of Agriculture and the Docks. The world average is three days.
In Brazil, the organs responsible for clearance of goods
run only during business hours. It is the only country
among the world’s major economies, which does not
have these services available 24 hours.
Provas
Em um porto onde trabalham 11 navios de reboque, 4 devem ser escolhidos para puxarem navios que aguardam entrada no porto.
De quantas maneiras diferentes esta escolha pode ser feita?
Provas
Caderno Container